Skip to main content
SNYDERSTAIRS
Builders · Custom Curved + Circular

Curved stairs are what we're known for.

Laminated curved stringers bent on our jigs, assembled and fitted in-house, with over-the-post handrails and volutes sourced and coped to fit. Curved and circular staircases for custom builders in the Lehigh Valley and the Route 78 NJ corridor — eight to twelve weeks in our Whitehall shop, four days on site with your trim crew.

─── Call line
(610) 443-2240Budget on the first call · No signup required
Grand sweeping curved staircase with warm bronze iron and an over-the-post handrail in a Lehigh Valley foyer
Custom Curved · Snyder StairsNew construction
✦ In short

What does Snyder Stairs offer for custom curved?

For custom builders, Snyder builds curved and circular staircases in-house — laminated curved stringers bent on our shop jigs, assembled and fitted, with sourced over-the-post handrails and volutes coped to fit. Built in walnut, mahogany, or white oak over an 8-12 week shop window, crated and delivered for your trim crew to install in about four days.

Built & reviewed by Snyder Stairs · Whitehall, PA · Est. 1987 · Updated June 2026

Custom Curved specs

At a glance — the numbers that matter.

Specs, lead times, and delivery details for this scope. Call (610) 443-2240 for a firm quote on your project.

(610) 443-2240
  • 01
    Shop time8–12 weeks
  • 02
    Install4 days · your trim crew
  • 03
    SpeciesWhite oak · walnut · mahogany · sapele · maple
  • 04
    CADPlan / elevation / section on contract
  • 05
    PricingBid by design · 50% deposit
  • 06
    We come backIf it's not right
Why builders trust us with curved

Curved stair is the hardest thing we build. We don't outsource it.

Most stair shops ship their curved work to a regional fab. We do the laminating, the assembly, and the over-the-post joinery in our own shop — sourcing the shaped handrail and volute parts and coping them to fit. Our own crew on every project.

  1. IReason · 01 of 04

    Laminated curved stringers

    Bent on our shop jigs from solid stock, not veneered over MDF. The stringer holds its shape for the life of the home.

  2. IIReason · 02 of 04

    Volute + over-the-post joinery

    Volutes, easings, and over-the-post transitions are sourced and coped to fit by our own crew, every project — joined so the handrail flows as one continuous line.

  3. IIIReason · 03 of 04

    Figured hardwoods

    White oak, walnut, mahogany, sapele, hard maple. We source figured stock for grand-foyer projects and book-match where the design calls for it.

  4. IVReason · 04 of 04

    8–12 weeks shop · 4 days site

    Curved stair adds 4–6 weeks to fab compared to a straight run. Your GC's trim crew installs in ~4 days with phone consults from us.

The build process
How a curved project runs

From sketch to crated stair.

  1. STEP 01

    Design + site measure

    We come out to the site (framed or pre-framed), measure the rough opening, and propose 2–3 design directions. Sketches + budget bands in 2 weeks.

  2. STEP 02

    Contract + CAD

    Plan / elevation / section drawings delivered on contract. Structural engineer signs off, design freezes.

  3. STEP 03

    Shop fabrication

    Stringer laminated and bent on our jigs. Treads cut from select stock and bookmatched if specified. Sourced volute and handrail coped to fit, dry-fit in-shop before crating.

  4. STEP 04

    Crated delivery

    Stair components crated and labeled. Delivered to the job site in one drop. We tour the crate with your GC's foreman before leaving.

  5. STEP 05

    Phone-consult install

    Your trim crew installs over 4 days with phone consults from our shop. We're available for any joinery question. Final inspection done on a walk-through visit at install completion.

Crated delivery vs on-site install

Crated to your crew, or installed by ours?

Most trade work ships crated for your framing or trim crew to set. Here is how the two paths compare so you can plan the schedule.

Crated delivery (your crew installs)

  • Pre-finished stair crated + tagged in install order
  • Delivered against your framing / trim date
  • Your crew controls the install window
  • Snyder consults by phone at no charge

On-site install (Snyder crew)

  • Snyder installs railings, baluster swaps, tread work
  • 1–5 days on site, pre-finished pieces only
  • No on-site staining or polyurethane
  • Site cleanup before the crew leaves
Custom Curved FAQs

Common questions on custom curved projects.

↳ Or call (610) 443-2240
Do you install the curved stair yourselves?

No — our model is fabricate-and-deliver, your trim crew installs. Faster turnaround for you, no scheduling conflicts with our shop floor. We're on the phone for the install duration and visit on completion for the walk-through.

What's your sweet spot for curved-stair budget?

Custom curved starts around $35K–$50K for a single-flight oak curve and runs to $150K+ for full helical walnut with sculpted volutes. Pricing is by design — we quote against the actual drawing, not a price list.

Can you do circular (helical) stairs?

Yes — about 1 in 8 of our custom-build projects is a full helix. Center-supported or self-supporting are both shop-buildable. Self-supporting helixes need 16-week shop time minimum.

Will the curved stair fit through my framed opening?

Yes — we ship in two or three segments and assemble in the foyer. Largest segment fits through a standard 36" opening. We sequence the install so your finished trim isn't compromised.

Talk to a personStill have a question?
Call (610) 443-2240

Custom curved project on the calendar?

Send us the architectural plan.

Design direction + budget bands in 2 weeks. 8–12 week fabrication, your trim crew installs. The same shop that's built Caruso, Rambo, and the Route 78 estates since 1987.

Budget on the first call · (610) 443-2240 · Whitehall, PA

Grand sweeping curved staircase with warm bronze iron and an over-the-post handrail in a Lehigh Valley foyer