Homeowners · Lehigh Valley
After a remodel, the stair is usually what's left that doesn't match.
Most Lehigh Valley homeowners come to us after a remodel — when the existing stair, railing, or treads no longer match. Send a few photos and we'll send a budgetary range the same business day.
- Tread replacement
- Railing rebuild
- Iron-baluster swap
- Parts for DIY

Six numbers we'll repeat on the phone.
Most homeowner questions live here. We'll confirm them on the same-day callback.
- 01Lead time4–6 weeks typical
- 02Deposit50% on contract
- 03Site measureFree · if needed
- 04Install on-site1–2 days, our own crew
- 05Haul-awaySame day, included
- 06Same-day callbackBudget on the call
Most homeowners come to us after new floors, a kitchen remodel, or to replace a carpet-grade staircase.
Tread replacement and railing replacement are the two jobs most homeowners come to us for — usually after a kitchen or flooring remodel, once the stair stops matching the new floors. Parts are available too, for the DIYer or basement remodeler.

The first thing we ask is what your floors are — your stair should match the house, not the other way around.
Stair shop, big-box, or your GC — who should rebuild your stair?
After a remodel most homeowners weigh three options. Here's the honest version of what each one actually gets you — measure, build, install, and who stands behind it when something loosens a year later.
Snyder Stairs
Big-box / online parts
General contractor
Family-owned & veteran-owned in Whitehall, PA since 1987 — two generations of stair specialists. If something loosens later, we come back and fix it.
3 pathways · 1 shop
Most homeowner calls start with one of these.
Same Whitehall shop, our own crew across all three — the difference is scope and ballpark. Pick the closest match; we'll dial in the rest by phone — a measure only if the job needs one.
- 01 / 03
Tread replacement
- Triggered by
- “I just refinished my floors.”
- Scope
- Pull old treads (risers stay), match new wood by species, install + haul away same day
- Lead time
- 4–6 weeks to fabricate · 1–2 days on site
- Ballpark
- $4.8K – $9.5K (LV core)
- Best for
- Just refinished floors and the stair treads no longer match
- 02 / 03
Railing & iron-baluster swap
- Triggered by
- “I'm rebuilding the railing — or swapping wood balusters for iron.”
- Scope
- New rail system — wood, iron, or both. Iron-baluster swap on an existing stair is a one-day job. Showroom visit by appointment for design
- Lead time
- 4–6 weeks to fabricate · iron swap is one day
- Ballpark
- $6.5K – $14K (LV core)
- Best for
- Existing rail looks dated against newly-renovated rooms
- 03 / 03
Parts & basement DIY
- Triggered by
- “I'm finishing my basement.”
- Scope
- Stock or non-stock wood + iron parts from our Whitehall shop — pickup or call to order
- Lead time
- Call to check stock
- Ballpark
- Catalog pricing
- Best for
- DIY-comfortable, smaller scope, basement remodels
Not sure which fits? Call (610) 443-2240 — we'll help you decide in 5 minutes. No commitment.
Six steps. Start to crate to install.
We use the same process for every homeowner project. The team's actual numbers — not ours.
- Step 01
Send pics
Snap a few of your existing stair (and any inspiration shots).
- Step 02
Budget window
Same business day. A rough range, not a final bid.
- Step 03
Parts pick — measure if needed
You pick handrail profile, baluster pattern, finish. If the job needs an on-site measure of the rough opening we set one up; simpler ones run from photos. Showroom visit optional.
- Step 04
50% deposit
Triggers fabrication. We schedule the install date with you.
- Step 05
Fabricate
4–6 weeks in our Whitehall shop. Cut, fit & finished before delivery.
- Step 06
Install + haul-away
1–2 days on site. Final payment day 1. We take the trash.
What we do · What we don't
Plain answer on what's in scope.
Snyder is a fabrication shop. We're transparent about what we do on-site at your home vs. what stays in our Whitehall shop — and what we leave to other trades.
- Railing rebuilds + iron baluster swapsFull on-site install. New handrails, newels, balusters — built in our shop, fitted in your home over 2–5 days.
- Tread + riser replacementWe cut and fit new treads to match your floor in our shop, then install them on-site.
- Full new staircase fabricationWe design, build, and crate the new stair. Your GC or trim carpenter installs it. We consult by phone during install.
- Stair parts supplyWood + iron parts stocked at our Whitehall shop. Walk in or call (610) 443-2240 to order.
- Staining, sanding, or refinishingWe deliver unfinished and don't sand existing stairs — your finisher stains and seals to match. We'll point you to good ones.
- Installing complete new stairs in finished homesFor a whole new staircase in a finished home, we fabricate and deliver, and your GC sets it. Less disruption, faster turnaround.
- Caulking, puttying, drywall, or trim carpentryAdjacent work like base shoe, riser caulking, or skirt board patching is your finish carpenter's scope — we'll point you to good ones.
Signature styles
Pick a style. We've built it before.
Signature stair styles, each pulled from real Snyder projects. Browse by aesthetic, then call us with the one that fits your home.
Real Lehigh Valley homes
Photographed in the homes they were built for.
Common questions, honest answers.
How disruptive is a stair install in a lived-in home?
Kids and dust are fine — vacuum it up. We close the stairs safely at five o'clock each evening so you can use them at night. Most installs are one to two days; tread replacements can run a little longer because the stairs are out of bounds while we work. We tarp the foyer floors, set a dust barrier between the stair and the rest of the house, and haul-away the old material the same day. You sleep in the house every night.
What if something doesn't look right after install?
Call us. We don't publish formal terms — the answer from a family-owned Whitehall shop is always 'something loosens later, we come back and fix it.' Our own crew that built your stair is the crew that comes back. Care + cleaning instructions go to you in writing at handoff, and you can always reach (610) 443-2240 to talk to someone who knows your project.
How long does fabrication take?
About 85% of our work — standard rail replacements, tread swaps — runs four to six weeks of fabrication. Custom newel posts and curved-stair work run eight to twelve weeks. An iron baluster swap on an existing stair is usually a one-day job with very little mess. We'll confirm the timeline on the first call before you ever commit.
Should I tell you my maximum budget or my minimum?
Aim high. Tell us the most you'd want to spend, not the least. We aim the budget window above your final number so the actual proposal lands under. Most customers walk away saying 'that's about what we thought' — that's the goal, not surprise. Realistic. That's the word.
Can I get a real number before anyone comes out?
Yes — that's the budget window. Send three photos (existing stair, the floor it has to match, and the room context) plus your zip code. We send back a rough range (low/high $) the same business day. It's not a final bid, but it's accurate enough to decide if the project fits your budget. The final number firms up once we've seen photos and picked parts — an in-home measure only if the job calls for it (also free, no commitment).
Same-day callback — does that mean I'll really hear back today?
If the form goes in before 3 PM ET on a business day, yes — by 5 PM. After 3 PM or weekends, you'll hear back the next business morning. We don't outsource calls; the person who calls you is on the Whitehall shop floor. We'd rather lose the lead than have you wait three days for a follow-up.
Do I need to know what style I want before contacting you?
No. Most homeowners arrive with vague intent ("something that matches the floors") and find their style at the showroom. You can take sample blocks of finishes and baluster patterns home from the showroom visit. The Style Finder Quiz on /stair-styles/style-finder gets you a starting direction in 3 questions — useful but not required.
Can the showroom visit happen on a weekend?
Yes — by appointment. Saturday visits are popular for working homeowners. The Whitehall shop is at 117 Franklin Street; we run Saturday slots 9-11AM. Walk-ins also welcome Mon–Fri 8A–4:30P with no appointment needed for a look around.
The words that keep showing up
Read our reviews. The same words keep coming back.
- Honest
- Transparent
- On time
- Above and beyond
“Easy to work with up front and honest and flexible. Installation went the best I've ever had.”
“Jesse was very helpful giving us ideas for how we wanted to design our staircase and was very transparent on pricing.”
“On time and on budget. They were very easy to work with and provided us with a beautiful stair.”
- 01 Send a few photos
- 02 Real budget on the first call
- 03Built in Whitehall, installed in 1–3 days
Homeowner pathway
Update the stair to match the rest of the house.
Send a few photos of your existing stair and any inspiration shots — we'll come back the same business day with a budget window. No commitment, no full proposal yet.
- A budget window the same business day.
- One of the Snyders replies — our own crew.
- No commitment, no full proposal yet.
A real person answers — no phone menu · 117 Franklin Street, Whitehall, PA · (610) 443-2240







