Skip to main content
SNYDERSTAIRS

Homeowners · Lehigh Valley

Whitehall, PA

After a remodel, the stair is usually what's left that doesn't match.

Most Lehigh Valley homeowners come to us after a remodel — when the existing stair, railing, or treads no longer match. Send a few photos and we'll send a budgetary range the same business day.

  • Tread replacement
  • Railing rebuild
  • Iron-baluster swap
  • Parts for DIY
Foyer with oak treads and turned white balusters — Faucett period restoration
Begin Your ProjectSee homeowner work

Budget window on the first call · (610) 443-2240 · Our own crew

What to expect

Six numbers we'll repeat on the phone.

Most homeowner questions live here. We'll confirm them on the same-day callback.

(610) 443-2240
  • 01
    Lead time4–6 weeks typical
  • 02
    Deposit50% on contract
  • 03
    Site measureFree · if needed
  • 04
    Install on-site1–2 days, our own crew
  • 05
    Haul-awaySame day, included
  • 06
    Same-day callbackBudget on the call
Who is this for?

Most homeowners come to us after new floors, a kitchen remodel, or to replace a carpet-grade staircase.

Tread replacement and railing replacement are the two jobs most homeowners come to us for — usually after a kitchen or flooring remodel, once the stair stops matching the new floors. Parts are available too, for the DIYer or basement remodeler.

Wide foyer with oak treads and a brick fireplace — the before-state context after a remodel
After a remodel — the stair stops matching

The first thing we ask is what your floors are — your stair should match the house, not the other way around.

After the remodel, the stair finally matches the house.

We measure it ourselves and don't farm out the build — and we send a budget window the same business day, so you know where you stand before anyone commits.
Which pathway fits

3 pathways · 1 shop

Most homeowner calls start with one of these.

Same Whitehall shop, our own crew across all three — the difference is scope and ballpark. Pick the closest match; we'll dial in the rest by phone — a measure only if the job needs one.

Side-by-side · Scannable
  • 01 / 03

    Tread replacement

    Triggered by
    “I just refinished my floors.”
    Scope
    Pull old treads (risers stay), match new wood by species, install + haul away same day
    Lead time
    4–6 weeks to fabricate · 1–2 days on site
    Ballpark
    $4.8K – $9.5K (LV core)
    Best for
    Just refinished floors and the stair treads no longer match
  • 02 / 03Most pick this

    Railing & iron-baluster swap

    Triggered by
    “I'm rebuilding the railing — or swapping wood balusters for iron.”
    Scope
    New rail system — wood, iron, or both. Iron-baluster swap on an existing stair is a one-day job. Showroom visit by appointment for design
    Lead time
    4–6 weeks to fabricate · iron swap is one day
    Ballpark
    $6.5K – $14K (LV core)
    Best for
    Existing rail looks dated against newly-renovated rooms
  • 03 / 03

    Parts & basement DIY

    Triggered by
    “I'm finishing my basement.”
    Scope
    Stock or non-stock wood + iron parts from our Whitehall shop — pickup or call to order
    Lead time
    Call to check stock
    Ballpark
    Catalog pricing
    Best for
    DIY-comfortable, smaller scope, basement remodels

Not sure which fits? Call (610) 443-2240 — we'll help you decide in 5 minutes. No commitment.

Who to call

Stair shop, big-box, or your GC — who should rebuild your stair?

After a remodel most homeowners weigh three options. Here's the honest version of what each one actually gets you — measure, build, install, and who stands behind it when something loosens a year later.

Who shows up
Snyder Stairs
One crew, measure to install
Big-box / online parts
Box on a pallet — you install it
General contractor
Subbed out to whoever's free
Where it's built
Snyder Stairs
Built in our Whitehall shop — parts coordinated in-house
Big-box / online parts
A box of parts you assemble yourself
General contractor
Ordered in and subbed out
Code compliance
Snyder Stairs
Code-compliant by people who install daily
Big-box / online parts
Specs are on you to verify
General contractor
Depends on the sub's day
Getting a number
Snyder Stairs
Budget on the first call — no form
Big-box / online parts
Add to cart and hope it fits
General contractor
Wait for a site visit + quote
After it's installed
Snyder Stairs
If something loosens later, we come back and fix it
Big-box / online parts
Returns and restocking fees
General contractor
Punch-list, if you can reach them
What it's made of
Snyder Stairs
American hardwoods + powder-coated iron, fit and finished in-shop
Big-box / online parts
Whatever's in the box — fit is on you
General contractor
Whatever the supplier stocked

Family-owned & veteran-owned in Whitehall, PA since 1987 — two generations of stair specialists. If something loosens later, we come back and fix it.

How a project runs

Six steps. Start to crate to install.

We use the same process for every homeowner project. The team's actual numbers — not ours.

  1. Step 01

    Send pics

    Snap a few of your existing stair (and any inspiration shots).

  2. Step 02

    Budget window

    Same business day. A rough range, not a final bid.

  3. Step 03

    Parts pick — measure if needed

    You pick handrail profile, baluster pattern, finish. If the job needs an on-site measure of the rough opening we set one up; simpler ones run from photos. Showroom visit optional.

  4. Step 04

    50% deposit

    Triggers fabrication. We schedule the install date with you.

  5. Step 05

    Fabricate

    4–6 weeks in our Whitehall shop. Cut, fit & finished before delivery.

  6. Step 06

    Install + haul-away

    1–2 days on site. Final payment day 1. We take the trash.

What we do · What we don't

Plain answer on what's in scope.

Snyder is a fabrication shop. We're transparent about what we do on-site at your home vs. what stays in our Whitehall shop — and what we leave to other trades.

In scopeWhat we do
  • Railing rebuilds + iron baluster swapsFull on-site install. New handrails, newels, balusters — built in our shop, fitted in your home over 2–5 days.
  • Tread + riser replacementWe cut and fit new treads to match your floor in our shop, then install them on-site.
  • Full new staircase fabricationWe design, build, and crate the new stair. Your GC or trim carpenter installs it. We consult by phone during install.
  • Stair parts supplyWood + iron parts stocked at our Whitehall shop. Walk in or call (610) 443-2240 to order.
Out of scopeWhat we don't
  • Staining, sanding, or refinishingWe deliver unfinished and don't sand existing stairs — your finisher stains and seals to match. We'll point you to good ones.
  • Installing complete new stairs in finished homesFor a whole new staircase in a finished home, we fabricate and deliver, and your GC sets it. Less disruption, faster turnaround.
  • Caulking, puttying, drywall, or trim carpentryAdjacent work like base shoe, riser caulking, or skirt board patching is your finish carpenter's scope — we'll point you to good ones.
What it runs

What a stair refresh runs in the Lehigh Valley.

Ranges to set expectations, not a quote. We give you a real budget on the first call, in 5–10 minutes.

  • 01 / 04
    from $5K

    Stair tread replacement

    match new floors, tread-by-tread, ~2 days

  • Most asked
    $6K–$14K

    Railing replacement

    wood or iron, measured + installed

  • 03 / 04
    $2K–$3K

    Iron baluster swap

    drops onto your existing stair — one day, very little mess

  • 04 / 04
    $2.5K–$20K+

    Custom staircase

    box, flared, or curved, built to your home

These are ranges to set expectations — not a quote. We tell you what doesn't need doing, so you only spend where it counts.

Looking for an expert · 39 years

Pick a style. We've built it before.

Signature stair styles, each pulled from real Snyder projects. Browse by aesthetic, then call us with the one that fits your home.

Browse all styles

Real Lehigh Valley homes

Photographed in the homes they were built for.

Frequently asked

Common questions, honest answers.

↳ Or call (610) 443-2240
How disruptive is a stair install in a lived-in home?

Kids and dust are fine — vacuum it up. We close the stairs safely at five o'clock each evening so you can use them at night. Most installs are one to two days; tread replacements can run a little longer because the stairs are out of bounds while we work. We tarp the foyer floors, set a dust barrier between the stair and the rest of the house, and haul-away the old material the same day. You sleep in the house every night.

What if something doesn't look right after install?

Call us. We don't publish formal terms — the answer from a family-owned Whitehall shop is always 'something loosens later, we come back and fix it.' Our own crew that built your stair is the crew that comes back. Care + cleaning instructions go to you in writing at handoff, and you can always reach (610) 443-2240 to talk to someone who knows your project.

How long does fabrication take?

About 85% of our work — standard rail replacements, tread swaps — runs four to six weeks of fabrication. Custom newel posts and curved-stair work run eight to twelve weeks. An iron baluster swap on an existing stair is usually a one-day job with very little mess. We'll confirm the timeline on the first call before you ever commit.

Should I tell you my maximum budget or my minimum?

Aim high. Tell us the most you'd want to spend, not the least. We aim the budget window above your final number so the actual proposal lands under. Most customers walk away saying 'that's about what we thought' — that's the goal, not surprise. Realistic. That's the word.

Can I get a real number before anyone comes out?

Yes — that's the budget window. Send three photos (existing stair, the floor it has to match, and the room context) plus your zip code. We send back a rough range (low/high $) the same business day. It's not a final bid, but it's accurate enough to decide if the project fits your budget. The final number firms up once we've seen photos and picked parts — an in-home measure only if the job calls for it (also free, no commitment).

Same-day callback — does that mean I'll really hear back today?

If the form goes in before 3 PM ET on a business day, yes — by 5 PM. After 3 PM or weekends, you'll hear back the next business morning. We don't outsource calls; the person who calls you is on the Whitehall shop floor. We'd rather lose the lead than have you wait three days for a follow-up.

Do I need to know what style I want before contacting you?

No. Most homeowners arrive with vague intent ("something that matches the floors") and find their style at the showroom. You can take sample blocks of finishes and baluster patterns home from the showroom visit. The Style Finder Quiz on /stair-styles/style-finder gets you a starting direction in 3 questions — useful but not required.

Can the showroom visit happen on a weekend?

Yes — by appointment. Saturday visits are popular for working homeowners. The Whitehall shop is at 117 Franklin Street; we run Saturday slots 9-11AM. Walk-ins also welcome Mon–Fri 8A–4:30P with no appointment needed for a look around.

Talk to a personStill have a question?
Call (610) 443-2240
The Snyder Standard

Same shop · Our own crew · 1987

More than a parts supplier — we build the stairs.

Most online stair-part shops are warehouses moving boxes — they've never coped a fitting or set a newel post. Snyder Stairs has been designing, building, and installing stairs and railings in Pennsylvania homes since 1987. Our reputation is built on job sites, not just websites.

5 of 5 standing
  • 01 / 05
    39+yrs
    Building stairs since 1987
  • 02 / 05
    6,000+
    Railing systems installed
  • 03 / 05
    350,000+
    Parts orders shipped
  • 04 / 05
    4.8★
    Verified Google rating
  • 05 / 05
    117Franklin St
    Our Whitehall, PA shop
  • American HardwoodsWhite oak, red oak, poplar, hickory — built in our Whitehall shop.
  • Veteran-OwnedService, integrity, discipline — on every order.
  • SMA MemberStair Manufacturers Association.
  • Family-OwnedTwo generations, since 1987.
4.8★ averageVerified on Google

Built in Pennsylvania · Family-owned since 1987 · Trusted across the Lehigh Valley and beyond.

The words that keep showing up

Read our reviews. The same words keep coming back.

  • Honest
  • Transparent
  • On time
  • Above and beyond
Easy to work with up front and honest and flexible. Installation went the best I've ever had.
Darrell Hotnisky · Google review
Jesse was very helpful giving us ideas for how we wanted to design our staircase and was very transparent on pricing.
Ian Christman · Google review
On time and on budget. They were very easy to work with and provided us with a beautiful stair.
John Liberatore · Google review
4.8 · 52 Google reviewsRead them all

Homeowner pathway

Update the stair to match the rest of the house.

Send a few photos of your existing stair and any inspiration shots. We'll come back the same business day with a budget window — no commitment, no full proposal yet.

Budget on the first call · (610) 443-2240 · Whitehall, PA

Foyer view up the stair from the curved base — Faucett period restoration