Run is too steep for code
Old basement stairs rarely hit current rise/run. The inspector flags it on the framing inspection; we re-cut the geometry so it passes.

When unfinished basements get finished, the original carpenter-built basement stair almost never makes the cut for code, comfort, or look. We build the new stair in our Whitehall shop and deliver it ready to set — your framing or finish crew sets it, and we install the railing system to code. Call us for a budget on the first call.
Usually — the original carpenter-built basement stair rarely meets code for a finished space. We build the new stair in our Whitehall shop and deliver it ready for your crew to set, then install the code-compliant railing ourselves. Lead time is 4–6 weeks; railing install is 1–2 days.
Reviewed July 2026 · Nick & the Snyder Stairs team, Whitehall PA
When finishing hits a stair problem
Most basement renovations hit a stair problem somewhere between framing and drywall. Here's what we see most.
Old basement stairs rarely hit current rise/run. The inspector flags it on the framing inspection; we re-cut the geometry so it passes.
Code wants a graspable, continuous handrail at 34–38″. A 2×4 nailed to the wall isn't it — we build a proper railing system end to end.
Open risers that pass a 4″ sphere fail in habitable space. We close the risers and finish them to match the basement floor.
Even when it passes, a 2×10 stringer with utility treads undercuts $50K of finished basement. We match the stair to the room.
Documentation & sign-off
The code geometry is only half of it; the project runs on the drawings behind it. Here's what's on contract before we cut, and what stays true until the inspector signs off.
Plan, elevation, and section — the drawings your township needs, in hand before fabrication starts.
Rise, run, handrail height, and a graspable continuous rail — spec'd to pass, not to argue.
We site-measure during framing and install between drywall and finish carpentry. No sequence delays.
Our own crew, no outsourcing. We don't leave the job until it's inspect-ready and the inspector signs off.
What's included
One contract, one crew — from the framing-window site measure to the CAD drawings your inspector signs off on. Family-owned since 1987, code-compliant on every job, and GC-friendly when the basement runs through a builder. Parts coordinated under one roof.
We come out and measure the real opening — no guessing.
Species, profile, iron pattern, finish — we guide it.
Built on our own floor — nothing outsourced.
Measure to install, all in-house. 1–2 days on site.
We take the old stair and debris the day we finish.
Something loosens later, we come back and fix it.
Plan, elevation, and section — you sign off before we cut.
Built to schedule and delivered when the framing's ready.
Basement installs run 3–5 days on site, demo included. Contractor pricing on every basement project — just tell us you're running the job.

We arrive after the rough opening is framed but before drywall. Measure the run, rise, finished floor heights, and confirm code clearances.

Pick wood species (matched to the basement floor), handrail profile, baluster pattern, finish. We provide the drawings your inspector needs to sign off.

4–6 weeks. Stringers, treads, and risers cut and finish-fit in Whitehall; newels, balusters, and handrail sourced from our suppliers and coordinated under one roof before delivery.

The stair arrives crated, ready for your crew to set. We install the railing system — typically 1–2 days — and leave it inspect-ready.
Basement-stair questions span homeowners and GCs. Same six numbers either way — we tune the conversation to whoever's calling.
Great from start to finish — they came out and measured for new stairs and railings, installed them in a timely manner, and had very competitive, reasonable pricing. It was always very easy to get someone on the phone whenever I called.
Yes — once the basement is habitable space (which is what "finishing" means under IRC), the stair must meet rise/run, handrail-graspability, and riser-closure code. Most carpenter-built basement stairs from before 2000 fail at least one of these. Snyder builds to current IRC and provides the drawings your inspector needs to sign off. We coordinate directly with your inspector if helpful.
We come out during framing — after the rough opening is set, before drywall — and measure. We schedule fabrication against your finish-carpentry date so the stair lands when you need it. Call us with your framing inspection date and finish-carpentry date — we line up the build against your schedule.
Yes — and we prefer it. Tell us the framing inspection date, the drywall date, and the finish-carpentry date. We slot install between drywall and finish carpentry. For builders working with us regularly, we share the schedule directly with your GC so the trades sequence correctly.
We work in retrofit mode. Pull existing stair (sometimes the surrounding drywall section), prep the new opening, install. Adds time on site for demo + drywall patching. Call us with photos and we'll talk through the retrofit scope.
If you want it to. Most homeowners spec the basement stair to match the basement floor (engineered hardwood is common) and skip the formal handrail of the upstairs main stair. For "showcase" basements (media rooms, gyms, secondary suites), we spec to match the main stair. Pick the level when we walk through the basement.
Either works. Homeowners come to us directly (we coordinate with your finish-carpentry crew), and GCs bring us in on basement projects they're already running. Contractors get trade pricing — just call us.

Homeowner finishing the basement?
Most basement finishes hit a code problem with the original stair. Send us photos of the rough opening — we'll tell you whether the geometry works or whether you're better off replacing. CAD drawings on contract for your inspector.
Basement renovation
If you're framing or just finished framing your basement, send a few photos of the rough opening and existing stair. We'll come out during your project window — no delays.
Budget on the first call · (610) 443-2240 · Whitehall, PA
