Skip to main content
SNYDERSTAIRS
A finished Snyder foyer stair remodel in a renovated Lehigh Valley home
Stair Remodel · Foyer Refresh

You renovated thewhole house. The stairnever caught up.

The thing most homeowners don't realize is possible: a complete stair refresh — treads, railings, and the foyer that holds them. We replace tired carpeted treads, dated wood spindles, and worn handrails — fabricated and finish-fit in our Whitehall shop and installed in two to five days on site. We do stairs and railings every day, not as a side scope.

─── Call line
(610) 443-2240Budget on the first call · No form required

How much does a staircase remodel cost in the Lehigh Valley?

A same-footprint remodel — new treads, new railing, existing structure kept — typically lands between $4.8K and $14K depending on scope, with fabrication in our Whitehall shop taking 4–6 weeks and on-site work a few days. Send photos of your stair and your town for a real budget range on the first call.

Reviewed July 2026 · Nick & the Snyder Stairs team, Whitehall PA

Our Approach

Keep the bones. Replace what's tired.

Most Lehigh Valley homes have a structurally sound staircase hiding under carpet, builder-grade spindles, and a 1990s oak handrail. We don't tear those out — we keep the stringers and the framing, and replace the parts you actually see. The first thing we ask is what your floors are, so the new treads and rail match the house by species.

Stringer framing detail beneath a Snyder-built foyer stair
Keep
Structural detail of the original stair carriage Snyder builds onto
Keep

The bones we don't tear out.

Most Lehigh Valley homes have a structurally sound staircase hiding under carpet and builder-grade spindles. We keep the stringers and the framing — the parts you never see — so the remodel reads new for a fraction of a full rebuild.

  • Stringers & stair carriage
  • Wall framing & rough opening
  • Floor-to-floor structure
Finished white-oak newel and treads with satin-black iron balusters after a Snyder remodel
Replace
New handrail and baluster assembly detail installed by Snyder
Replace

The parts you actually see.

We pull the carpet, set solid hardwood treads on the existing stringers (the risers stay), swap wood spindles for iron, and replace the handrail and newels — every new piece matched to the house and its era by species.

  • Solid hardwood treads, matched by species
  • Iron or turned-wood balusters
  • Handrail & newels, cut and finish-fit in-shop

Wood parts are cut, fit, and finished in our Whitehall shop — we don't sand or refinish on your floors. Our own crew, same shop, since 1987.

What a remodel costs

Real ranges for most Lehigh Valley remodels.

A ballpark to put you in range — not a bid. Your final number comes after the free in-home site visit, where we price only what's in scope.

  • 01 / 04
    from ~$3K

    Tread replacement

    carpet up, hardwood treads set on your stringers · risers stay

  • 02 / 04
    $2K–$3K

    Iron baluster swap

    satin-black iron set into your existing rail · one day, little mess

  • Most asked
    from ~$2.5K

    Full railing replacement

    new handrail, newels, and balusters · 1–2 days

  • 04 / 04
    from ~$2.5K

    Custom staircase

    a new build, fabricated and finish-fit to your home (grand custom $20K–$70K)

These are ranges to set expectations — not a quote. We tell you what doesn't need doing, so you only spend where it counts.

Days, not weeks

In your house, then out of your way.

The shop does the slow work — cutting, fitting, finishing, and staging sourced parts — before we ever step on site, so the disruptive part stays short. We protect your floors and sweep up every night.

  • 1–3 days

    Tread replacement

    Stairs usable each evening; we clean up before we leave.

  • One day

    Iron baluster swap

    Set into your existing rail — very little mess, usable that evening.

  • 1–2 days

    Railing replacement

    Rail off only while we work; haul-away included.

  • Stay home

    Whole-foyer refresh

    Floors protected, family in the house, swept every night.

What's included

Every remodel includes all of this.

No à-la-carte surprises. From the free measure to the haul-away, the same family-owned crew handles it — and if something loosens later, we come back and fix it.

  • Free in-home site measure

    We come out and measure the real opening — no guessing.

  • Design + selection help

    Species, profile, iron pattern, finish — we guide it.

  • Built in our Whitehall shop

    Cut and fit on our own floor — the build never leaves our shop.

  • Installed by our crew

    Measure to install, all in-house. Two to five days on site.

  • Same-day haul-away

    We take the old stair and debris the day we finish.

  • We stand behind it

    If something loosens later, we come back and fix it.

Family-owned in Whitehall since 1987 · our own crew measure-to-install · parts coordinated under one roof.

Real project
Before & After

Two days. One staircase. Brand-new foyer.

Lehigh Valley colonial — wood spindles to iron balusters, carpet to white oak treads. Two-day install with the family staying in the home.

Typical scope
  • 4–6 wksShop fabrication
  • 1–2 daysTread / railing install
  • One dayIron-baluster swap
  • Same dayBudget from 3 photos

Drag the handle (or use arrow keys) to wipe between the original and the finished install.

1–3 day installCrated deliveryBuilt in Whitehall
Center Valley colonial — white oak treads and iron balusters after the Snyder remodelAfter
Center Valley colonial — carpeted treads and wood spindles before the Snyder remodel
Before
What to Expect

Non-disruptive remodels, finished in days.

  1. Foyer staircase with turned balusters and stained-glass landing — Faucett period restoration.
    Step 01 of 04

    FIELD VISIT

    We come to your home, measure the existing stair, photograph the rail and spindles, and talk through what you'd change.

    1 hour · freeYour home
  2. A stair tread and finish sample during the selection conversation for the written estimate.
    Step 02 of 04

    ESTIMATE

    Written quote with treads, risers, baluster pattern, and a clear day-by-day timeline. Pick what's in scope — no surprises later.

    3–5 days3–5 days · written
  3. Remodel treads and balusters in production on the Snyder shop floor in Whitehall, PA.
    Step 03 of 04

    PRODUCTION

    Treads cut, fit, and finish-prepped in our Whitehall, PA shop. Iron balusters sourced and ready before we step on site.

    2–3 weeks in shop117 Franklin St · Whitehall
  4. Fitting and hand-sanding new oak treads on an existing stair — process illustration.
    Step 04 of 04

    INSTALLATION

    Most remodels finish in two to five days. We protect your floors, work around your schedule, and clean up every night before we leave.

    2–5 days on siteYour home
Frequently asked

Frequently asked. Answered honestly.

↳ Or call (610) 443-2240
How much does a staircase remodel cost?

The scope band above has the tier-by-tier ranges; here's the short version. A tread replacement runs from about $3,000; an iron baluster swap about $2,000–$3,000; a railing replacement from about $2,500; treads plus railing roughly $8,000–$18,000 (a basic stair from about $6–7K); and a from-scratch custom staircase from about $2,500, with grand custom builds running $20K–$70K. Curved continuous handrail, custom newels, and wood species are what move the number most. Those are ranges to set expectations, not a quote — your final number comes after a free in-home site visit, where we measure the real opening and price only what's in scope. We give you an honest ballpark on the first call in 5–10 minutes.

How long does a stair remodel take?

Most Snyder Stairs remodels finish in two to five days on site, depending on scope. An iron baluster swap is typically one day, with very little mess. A full foyer refresh — treads, balusters, and handrail — runs four to five days. Production happens in our Whitehall, PA shop ahead of time, so the on-site portion stays short.

Do we need to vacate the house during the remodel?

No. We work around your schedule and around the family staying in the home. We protect adjacent floors, contain dust, and clean up each evening so the house is livable overnight. You'll lose use of the staircase itself for one to two days during tread install, but most clients plan to use a back stair or stay upstairs during that window.

Can you match my existing handrail or floor?

Yes — we match by species. We work in white oak, red oak, poplar, and hickory, plus more on request (about a dozen species), so the new treads and rail read like the rest of the house. Come by the Whitehall showroom to see samples against your floor and trim. If you're replacing the handrail entirely, we cut, fit, and finish the new one in our shop to the profile you'd like.

Iron balusters versus wood — what's the right call?

Depends on the home — that's the honest answer. Iron meets modern code with a thinner profile, never warps, and never needs refinishing, so it's a great low-maintenance update. But in a traditional colonial, turned wood often fits the house better, and a trendy look you'll want gone in five years is money wasted. We'll tell you what matches your home, not what's hot this year. A range of iron patterns to choose from — come by the showroom to see them.

Do you outsource any of the work?

We're a family-owned shop in Whitehall and have been since 1987 — our own crew measures your stair, cuts and finish-fits the wood parts on our own floor, and installs them. Posts, balusters, and iron are sourced from specialist suppliers and coordinated under one roof, so the person who quotes your remodel is accountable for it start to finish.

Do you stand behind the work?

Yes. If a tread squeaks, a baluster works loose, or anything we installed shifts later, we come back and fix it. Standing behind the work is the whole point of keeping it in-house with our own crew, start to finish.

Talk to a personStill have a question?
Call (610) 443-2240
Faucett period restoration — stair and railing built in our Whitehall shop

GC on a foyer remodel?

Sub the stair work — we'll keep your schedule honest.

Most foyer remodels hit a stair problem somewhere between framing and finish. Send us photos and your dates; we define the scope, build to your schedule, and install in one to three days. Or refer the homeowner and stay GC.

  • 1–3 day install
  • Schedule-honest
  • Refer or sub

Where we do this work

Stair remodels across the Lehigh Valley — see how the job runs in your town:

Ready when you are

Remodel the stair to match the house.

Free in-home consultation. We measure your existing stair, talk through what you'd change, and walk you through species, baluster patterns, and pricing. No charge for the visit.

Budget on the first call · (610) 443-2240 · Whitehall, PA

A finished white-oak foyer staircase after a Snyder remodel