Skip to main content
SNYDERSTAIRS
Curved Stair

Macungie, PA · October 2023

Rambo · Lehigh Valley

Walnut treads · Walnut over-the-post handrail · Sculpted newels · Wood balusters

  • 12 weeks shop · 4 days on site
  • Macungie, PA

The story

A curved over-the-post stair is the hardest thing we build, and the Rambo project was the most photographed one we shipped that year. Twelve weeks in the shop laminating the stringer, cope-fitting the volute and newels, and dry-fitting every joint before it went on the truck.

Walnut throughout — treads, risers wrapped in walnut veneer, and a continuous handrail that takes a single uninterrupted line from the first-floor newel to the second-floor balcony. The carved newels are a traditional acorn pattern, sourced and fit to the run under our roof.

Four days on site with two of our installers. The Rambos hosted a holiday dinner the next week.

Photo set

Detail shots from the install.

Photographed in the Rambo home after final cleanup. Click any tile to open the full-size lightbox.

Want your home on this list?

Your home, built by the same Whitehall shop.

Every Snyder project starts with a phone call and a free in-home measure. We'll talk through species, profile, and timeline — then build it once, in our Whitehall, PA shop, the way it was supposed to be built.

Budget on the first call · (610) 443-2240 · Whitehall, PA

Two-story Caruso foyer with the full dark-and-white multi-run staircase and chandelier